
The footbridge control panel

Julie & Ian operate
Thorne Lock (Castaway
in the lock)

Julie operates
Thorne Lock Swing Bridge (while Ian looks on in amazement)

Julie & Ian return to boat after operating
Thorne Lock & Swing Bridge
Finally reaching the
'Watering
Hole' (unfortunately now closed !!! -
18/08/08)
Ian at home with his
other pastime
Ian & Julies pictures below

Julie at the tiller

Julie at the tiller (the ducks are following - so she didn't run
over them !)

Ian still taking the strain !

Ian still taking the strain I think the boat is
winning the battle ! (Mel)

A lesson in knot tying (or NOT tying -
it still failed to hold - (Mel)

Ian opening Thorne footbridge

Julie keeps a watchful eye on Ian - currently 'at the tiller' - Thorne
lock ahead

Mel thinks the BMW will have to
go - to be replaced with a Reliant Robin and a boat !!

Mel thinks the BMW will have to
go - to be replaced with a Reliant Robin and a boat !!
(the car will fit on the deck of a decent sized
wide beam boat)