CASTAWAY - Required Work - April 2008 1 Dry dock or lift out for hull
blacking and 4 x new anodes 2 Water tank to be steam cleaned, blacked and cover re-sealed 3 Bow tank for Bubble
Diesel Stove to be modified if required 4 Stove installation to
be checked and modified as required 5 Check propeller dimensions and fit larger prop if required 6 Possible new battery management system ?? 7 Re-paint - started by Mel & June - September, 2007 - to be completed 2008 |
|
CASTAWAY -
BUBBLE DIESEL
STOVE
Click Here for
Harworth Heating Ltd
Stove was installed in November, 2004 but the bow tank was never
completed.
Click Here for possible approaches to sealing the tank Click Here to Close This Window & Return to Your Last Page Mel Ashton (01924) 834 464 (home)